Machine Tools > Grinders & Grinding Machines > Surface Rotary Grinders Vert. Spdl    < Back

Blanchard #22HK-42, 42", 100 HP Geared Head, Vertical Rotary Surface G - $RFQ

Item Number: #00084530
Blanchard #22HK-42, 42&quot;, 100 HP Geared Head, Vertical Rotary Surface G
 
 
 


Blanchard #22HK-42, 42", 100 HP Geared Head, Vertical Rotary Surface G
 
Stock Code:  16119
Price: $RFQ
Subcategory: 

Surface Rotary Grinders Vert. Spdl

Year of Manufacture:  1970
Manufacturer:  Blanchard
Model:  22HK-42
Condition: Used
 
Tag Number: 16119
Machine Type: Grinding Machines
UMCC: G8100
Manufacturer: Blanchard
Model: 22HK-42
Year: 1970
Serial Number: 13317
Description: Blanchard #22HK-42, 42", 100 HP Geared Head, Vertical Rotary Surface Grinder


We Offer Turnkey Services with this Machine.

Printer Friendly Page Get a Quote
Overall Specifications

Specifications:
22" Grinding Wheel Diameter
42" Magnetic Chuck Diameter, .435" Remaining
49" Swing Inside Water Guards
24" Vertical Range
100 HP Grinding Wheel Horsepower
Geared Head Design
Automatic Down Feed
0 -.080 IPM Down Feed Rates
6 to 33 RPM Chuck Rotation Speeds
Automatic Lube System
Floor Space: 13.8"L x 8.4"W
Height: 8.8" Min., 9.7" Max.
Approx. Weight: 16,250 lbs
Wet base Conveyor Style
Thank you for choosing F. P. Miller Company to provide you with a quote on a purchase and rebuild of a Blanchard Rotary Surface Grinder. The work would consist of a mechanical rebuild which includes specific items as follows:
1) MACHINE DIS-ASSEMBLY:
a) Completely disassemble machine &amp; inspect parts and castings.
b) Clean and wire brush all parts
2) TABLE AND TABLE SUPPORT WAYS:
a) Machine as required.
b) Precision Scrape, fit the table support ways to the table ways.
c) Installation of Moglice wear material in cup if needed.
d) Grind magnetic chuck hardened bull gear
3) CARRIAGE AND BASE WAYS:
a) Re-grind hardened base ways (Replace if needed)
b) Precision scrape and fit carriage to base ways.
c) Installation of cast iron wear strip if needed
4) VERTICAL SLIDE AND COLUMN WAYS:
a) Machine as required
b) Precision scrape and fit the vertical slide ways to the column ways including the gibs.
c) Replace or rebuild Elevating Screw and Nut
d) Installation of cast iron wear strip if needed.
5) CARRIAGE AND TABLE DRIVE MECHANISMS
a) Inspect and rebuild carriage drive assembly (including replacing bearings and seals).
b) Replace Rack and Pinion
c) Inspect and rebuild table drive assembly (including replacing bearings and seals).
6) HEAD FEED MECHANISM:
a) Inspect and rebuild head feed as required (including replacing bearings and seals).
b) Inspect Feed worm gear and pinion, remove backlash.
7) SPINDLE UNIT (Geared head motor):
a) Disassemble the spindle unit, clean and evaluate.
b) Check spindle taper fit to chuck collar taper, and repair if required.
c) Disassemble, clean, inspect oil pump unit &amp; repair if necessary
d) Replace upper and lower bearings and oil seals
e) Meg main drive motor, clean, rebake &amp; rewind if necessary.
f) Replace upper and lower bearings and oil seals.
g) Reassemble the spindle unit and test.
8) ELECTRICAL FEED MOTORS:
a) Disassemble feed motors, clean and evaluate.
b) Replace bearings
9) LUBRICATION SYSTEM:
a) Install Automatic oil lubrication system
b) Remove all lube lines on the carriage, base and table.
c) Replace or reuse all lube blocks and clean oil ports on the carriage, base and table.
d) Re-pipe with all new lines and fittings, the carriage, base and table.
10) GREASE SYSTEM:
a) Install new automatic grease system
b) Replace all lube lines on the column ways.
c) Replace or re-use all lube blocks and clean oil ports on the column ways.
d) Replace all lube fittings on the column.
11) ELECTRICAL:
a) All new wiring on machine
b) New magnetic controller
c) All new limit switches and push button switches (placed to your configuration)
d) Electrical Panel and components replaced.
e) Install soft start for table
f) Updated Schematics
g) Updated manuals
12) MAGNETIC CHUCK:
a) Meg Magnetic Chuck
b) Install New Magnetic Chuck Controls
13) GUARDING AND COOLANT LINES:
a) Replace all water guards
b) Fit to machine
c) Install new coolant Lines and External Clean Out Hose
14) PAINT:
a) Sand entire machine to original machine surface.
b) Clean.
c) Prime and paint grey. Will accommodate customers paint specs if possible
15) REASSEMBLY OF MACHINE COMPLETE AND TEST:
NOTE: Items not covered in this quote:
Resurfacing of Magnetic Chuck
REQUIREMENTS:
1. CONTRACTORS RESPONSIBILITY:
F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.
2. DIS-ASSEMBLY AND INSPECTION:
-All areas and items of rebuild will be completely dismantled to basic parts and castings.
-All parts and castings will be thoroughly inspected for defects.
3. RE-UTILIZATION OF PARTS:
-All parts that will be reused will be in such condition to assure proper part functi
 
This machine is listed for sale by F.P. Miller Company located in Jackson, Michigan
 
Contact the Seller
 
F.P. Miller Company
  420 Ingham St.
Jackson
MI 49201
United States
 
Request Call from Seller Email seller
View sellers full listings/Website
     

Email Seller

Name*:
Email*:
Phone*:
Address*:
Company*:
Comment*:
Type the code shown*:
Security Code
Send Email
* Mandatory field
Note: For security all enquiries may be monitored

Print Advert Tell a Friend
Add to Watch List Report Advert
 
* Report advert as sold or incorrect details